Edison Township

Middlesex County

TextClient checklist

Certificate of Occupancy

Required
Certificate
Residential Resale Certificate (Edison Certificate for Change of Ownership/Tenancy)
Issued by
Code Enforcement, Township of Edison
Requirements
  • Smoke certificate from Fire Prevention must be issued before the Resale Certificate
  • Check for open permits; any work that needed a permit must get a compliance permit, be inspected and closed
  • Additions, alterations, finished basements or attics, garage conversions, patios, decks, pools and spas must have zoning and building approvals
  • Pool or spa: fence and childproof gate required
  • Handrails and guardrails secure and proper height; stair riser openings under 4 inches
  • Water heater, furnace, air conditioner and boiler installed with permits and working
  • Water heater: pressure relief valve, bonding cable, relief pipe (not black pipe) ending 6 inches from the floor, unthreaded
  • Oil and gas flue connections secure; gas appliances have shut-off valves
  • Clothes dryer vented outside
  • No openings in garage ceilings or walls next to living space
  • House numbers on the front of the house, at least 4 inches high
  • Existing GFI outlets working
  • No junk or debris in basement, attic or yard
  • No keyed locks on bedrooms; exit doors without a keyed inside lock
  • No imminent hazards
Fees
Residential Resale Certificate (1 or 2 family)$150
Timing
Have the inspection done at least 3 weeks before closing (the form); the instruction page says at least 4 weeks
Phone
732-248-7257

Smoke and CO alarm certificate

Required
Requirements
  • Battery smoke alarms must be 10 year sealed battery type; existing hardwired alarms cannot be replaced with battery alarms
  • Smoke alarms no more than 10 years old
  • Smoke alarm on every level including the basement (3 or more steps counts as a separate level), within 10 feet of bedroom doors; basement alarm on the ceiling or beam at the base of the stairs; finished loft or attic living space needs an alarm
  • Alarm type follows the year the house was built (hardwired and interconnected rules for homes built after 1977, and alarms in each bedroom for homes built from March 1991)
  • CO alarm within 10 feet of sleeping areas; a bedroom with a fuel burning appliance needs its own CO alarm; bring the CO alarm instructions to the inspection
  • Secondary power sources (solar, battery storage, installed generator) must be labeled per P.L.2025, c.19
  • Supervised or monitored alarm systems must be kept working at change of occupancy

Edison Division of Fire, Bureau of Fire Prevention (Fire Marshal's Office)

Fees
Request received more than 10 alternating business days before inspection$60.00
Request received 5 to 10 alternating business days before inspection$90.00
Request received 1 to 4 alternating business days before inspection$140.00
Failure to appear for a scheduled appointment without notice$50.00
Re-inspection after a failed inspection$20.00
Demolition letter$25.00
Timing
Fees are based on alternating business days (by zip code) before the inspection; more than 10 alternating business days gets the lowest fee
Phone
732-248-7558

Other towns in Middlesex County

Look up any New Jersey property on Watchdog

Found this helpful? Show appreciation with a tip on Venmo

Add CO Requirements