Certificate of Occupancy Required
Certificate of Construction Records Clearance (CRC), described on the Township site as a Municipal Code Compliance Inspection · Clinton Township Construction Code Enforcement (Building Department)
- Records inspection for open construction permits and pending, open, unabated violations
- All building permits must be closed out (final inspections and prior approvals obtained) and violations cured before the certificate is issued
- Bring the completed application and fee to the Building Department to schedule
| Construction Records Clearance, more than 10 business days before closing | $75.00 |
| Construction Records Clearance, 10 business days or less before closing | $100.00 |
| Updated certificate (update of a prior records inspection within six months) | $35.00 |
Smoke and CO alarm certificate Required
- Smoke alarm on each level of the home and outside each separate sleeping area
- Battery-only smoke alarms must be 10-year sealed battery units; hardwired alarms from original construction may not be replaced with battery alarms
- Carbon monoxide alarm in the immediate vicinity of the sleeping areas (where there is a fuel-burning appliance or attached garage)
- Secondary power source identification label, only if the home has a secondary power source (added by P.L.2025, c.19)
Clinton Township Bureau of Fire Safety (Fire Marshal's Office)
| Smoke/CO certificate, more than 10 business days before change of occupancy | $50.00 |
| 4 to 10 business days before change of occupancy | $90.00 |
| Fewer than 4 business days before change of occupancy | $161.00 |
| Re-inspection (failed inspection or no-show) | $50.00 |